Task:  Supply and erect more than 500 tonne of structural steelwork over and within the existing factory frame.

  • Altro Flooring, Letchworth Garden City
  • Undisclosed
  • New build, refurb (mix)
  • £1.1m
  • 2011-2012

Also included in our package were various stairs, balustrades (to match existing) and approx 500m worth of internal suspended gantry framing complete with flooring and safety rails.

This extremely complex job involved the use of a tower crane to erect the new roof trusses and steelwork over the existing structure whilst the factory was in constant use.

Also included was approx 500m worth of internal suspended gantry framing (complete with flooring and balustrade).

Crofton Engineering were appointed to supply and erect more than 500 tonnes of structural steelwork over and within the existing factory frame.