Task: New auditorium steelwork, link bridges and structural alterations to the existing building including steel strengthening works and atrium infills.

Installation was carried out without the use of a tower crane meaning many of the larger steels had to be spliced or site welded. Splice designs were by Crofton

Nomura Bank London EC4