Task: Structural alterations to the existing building which included steel strengthening works and various atrium infills. 

Installation was carried out without the use of a tower crane meaning many of the larger steels had to be spliced. Splice designs were by Crofton. After inspection by the district surveyor Crofton were congratulated for their high quality of work

Drapers Gardens London EC2